Infrastructure
    Geology condition
        Flat and even terrain.
 Good bearing capacity, averagely from 1 kg/cm2 to 1.5 kg/cm2. 
 The soil composition is mainly sandy clay
Roads
            Main road system
            	+ Width: 36m
+ Lane Amount: 6 lines
Internal road system
            	+ N/A
Power supply
            The National grid
            	 
110 Kv Power Station with capacity of 40 MVA for exclusive utility of the IP; Electricity price is as per Regulations of the Prime Minister
                
                Standby power plant
            	+ N/A
Water supply
       + Water supply system attained standards 1329/BYT of Health Ministry
Sewage treatment plant
       * System of waste water discharge and rain water discharge separately.
* Being carry out legal procedures to construct the wastewater treatment plant (to set up 
investment project, design and put it out to tender).
 	 	 	 
       Internet
       + ADSL
Telecommunication
       +IDD
	
     

 HOMEPAGE