Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer VIGLACERA
Location Hai Yen Commune, Mong Cai City, Quang Ninh Province
Area Total area 182.42 ha
First stage 34 ha
Second stage 148.42 ha
Industrial Land 120 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation 2005
Total Current Investors
ISO Application N/A
LOCATION & DISTANCE
Strategic Location:

Hai Yen

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others
Other Transportation System  + Cai Lan Port: 170 km
 + Van Gia Port: 18 km
INFRASTRUCTURE
Geology Condition
Roads Main road system

– The width of the center road is 43.5 m. The width of main roads with 2 lanes is 33 m and the belt roads is 21,25 m
– The Industrial Park is connected with the National Road No. 18 (new) and the old national road by 02 interchanges.

Internal road system

Width: 20m - 27m

Number of lanes: 2 lanes

Power Supply The national grid

 

Power is supplied from national grid through 110/22KV transformer station with capacity of 32 MVA.

Standby power plant

N/A

Water Supply

Water supply
Water treatment station with capacity of 6,500 m3/day.(The diameter of water supply pipe is D100mm – D400mm). The water is collected from Trang Vinh lake 6km far from Hai Yen IP.

Drainage system
Rain-water drainage system and waste-water drainage system is constructed separately.
– The diameter of rain-water drainage pipe is D800 mm – D1250mm with the principle of automatic drainage.

Sewage Treatment Plant

 

– Waste-water treament station with capacity of 4,000m3/day. Capacity increases depending on the demand.
– Industrial waste-water is by 80% water supply.
– The diameter of waste-water drainage pipe is D300mm – D600mm.
– Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Mong Cai City.

Internet

– Modern communication system reachs international standard
– People are living in the economic ring area can together use Viet Nam and China telecomunication network.

Telecommunication

Modern, Perfect

LEASING PRICE
Land Leasing price 30 USD
Leasing term 2055
Other information
Payment method
Minimum plot area 5000
Factory Leasing price 3.5 USD
Leasing term 5yrs
Payment method
Scale of factory 2100
Deposit 6months
Factory for sale 0 USD
Other information
Management fee Management fee 0.3 USD
Payment method
Electricity Price Peak time 2556 VND
Normal hour 1405 VND
Off peak time 934 VND
Other information
Payment method
Water Price Price of industrial water supply (m3) 10100 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 7500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.