Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer VIGLACERA
Location Dong Mai Commune, Yen Hung District, Quang Ninh province
Area Total area 160 ha
First stage 85 ha
Second stage 75 ha
Industrial Land 116.7 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation 2008
Total Current Investors
ISO Application N/A
LOCATION & DISTANCE
Strategic Location:

Dong Mai

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others Noi Bai International Airport 150 km
Other Transportation System  + Cai Lan Port: 25 km
 + Hai Phong Port: 20 km
INFRASTRUCTURE
Geology Condition
Roads Main road system

– The width of main roads with 2 lanes is 43 m and the branch road is 27 m and 15 m.
– The road of Industrial Park is designed to connect to Highway 18, which is convenient for transportation.

Width: 43m

Number of lanes: 4 lanes

Internal road system

Width: 21m, 27m

Number of lanes: 2 lanes

Power Supply The national grid

Power is supplied from the national grid through 110/22KV, transformer station with capacity of 1 x 25 MVA and 1 x 16 MVA.

110/22 Kv

Capacity: 25 MVA, 16 MVA

Standby power plant

N/A

Water Supply

 

Water supply
– The Water supply Station has capacity of 6,500 m3/day/night.
– The diameter of water supply pipe is D100 mm to  D500mm.

Drainage system
Rain water drainage system is constructed separately with waste water drainage system in the IP. The diameter of underground rain-water drainage pipes D600 mm – D1000mm with the principle of automatic drainage.

Sewage Treatment Plant

– Waste water treatment Station with capacity is 4,800 m3/day.(Industrial waste water is by 80% the quantity of water supply).
– The diameter of waste water drainage pipe is D300mm – D500mm
– Solid Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Quang Ninh Province.

Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.

Telecommunication

Perfect, meet International Standard

LEASING PRICE
Land Leasing price 0 USD
Leasing term 2058
Other information Level A
Payment method
Minimum plot area 10000M2
Factory Leasing price 3 USD
Leasing term 5 YEARS
Payment method
Scale of factory 2100
Deposit 6 MONTHS
Factory for sale 0 USD
Other information
Management fee Management fee 0.5 USD
Payment method
Electricity Price Peak time 2556 VND
Normal hour 1453 VND
Off peak time 934 VND
Other information Above prices exclude VAT
Payment method Monthly
Water Price Price of industrial water supply (m3) 10100 VND
Other information Above price excludes VAT
Payment method Monthly
Sewage Treatment Fee Fee of sewage treatment (m3) 7500 USD
Method of counting the volume
Payment method
Standard of input treatment Level B
Standard of output treatment Level A
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.