Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer VIGLACERA
Location Tu Son Town and Tien Du districts, Bac Ninh
Area Total area 350 ha
First stage 135 ha
Second stage 215 ha
Industrial Land 0 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation 1999
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:

TIEN SON INDUSTRIAL PARK
Location: Tien Son and Tien Du District, Bac Ninh Province, Vietnam.

– from Hanoi capital: 22km (30’)
– far from Noi Bai International Airport: 35km (40’)
– far from Hai Phong deep seaport: 110km (1h55’)
– far from Cai Lan deep seaport (Quang Ninh): 120km (2h30’)
– far from Lang Son international border gate (China): 120km (2h50’)

 

Bac Ninh

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others
Other Transportation System  + Cách cảng biển Hải Phòng: 110 km
INFRASTRUCTURE
Geology Condition
Roads Main road system

– Internal traffic system covers 15% total IP area, including main road with 2 lines of 37m wide and 28m wide lanes.
– Tien Son Industrial Park is linked tonational road No. 1B by 4 geometry across points and 2 fly-over bridges.
– Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.

Internal road system
Power Supply The national grid

Power is supplied from national grid through 110/22KV (35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.

Standby power plant
Water Supply

Water supply
Water treatment station with first phase capacity of 7,000m3/day. (The diameter of water supply pipe is D100 mm – D300mm)

Drainage system
Rain water drainage system separate to waste water drainage system. The drainage pipe diameter is D1,000 mm – D1,250 mm with the principle of automatic drainage.

Sewage Treatment Plant

– Waste water treatment station with the first phase capacity is 4,000 m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh Province.

Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.

Telecommunication
LEASING PRICE
Land Leasing price 80 USD
Leasing term 2056
Other information
Payment method
Minimum plot area 10000
Factory Leasing price 3.5 USD
Leasing term 5 years
Payment method
Scale of factory 2100
Deposit 6 months
Factory for sale 0 USD
Other information
Management fee Management fee 0.5 USD
Payment method
Electricity Price Peak time 2556 VND
Normal hour 1405 VND
Off peak time 934 VND
Other information
Payment method
Water Price Price of industrial water supply (m3) 8250 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 6500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.