Glanced Image
OVERVIEW
Developer VIGLACERA
Location Yen Phong distr., Bac Ninh province, Vietnam
Area Total area 658 ha
First stage 344 ha
Second stage 314 ha
Industrial Land 0 ha
Factory Land 0 ha
Vacant Land 100 ha
Time Of Operation 2005
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:
 

– from Hanoi capital: 35km (45’)
– far from Noi Bai International Airport: 22km (30’)
– far from Samsung Thai Nguyen: 60km (1h)
– far from Hai Phong deep seaport: 110km (2h)
– far from Cai Lan deep seaport (Quang Ninh): 120km (2h30’)
– far from Lang Son international border gate (China): 120km (2h50’)

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others
Other Transportation System  + Cách cảng biển Hải Phòng: 110 km
INFRASTRUCTURE
Geology Condition
Roads Main road system

– Yen Phong Industrial Park is connected to national road No. 18 by a intersection traffic point and a flyover bridge. Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.
– Main roads have two 80m lanes. Branch roads are 40m and 22m.

Internal road system
Power Supply The national grid

Power is supplied by national power network via 110/22kV (35KV) transformer station with current capacity of 7 x 63 MVA.

Standby power plant
Water Supply

Water supply
– Water supply station of the first phase has capacity of 36,000m3/day and the second phase has capacity of 22,000m3/day. (The diameter of water supply pipe is D150 mm – D400 mm)
– Water supply system is connected directly to the fence of enterprises.

Drainage system
– Rain water drainage system separate from waste water drainage system.
– The drainage pipe diameter is D800 mm – D1250 mm with the principle of automatic drainage.

Sewage Treatment Plant

– Waste water treatment station runs  with the 1st phase capacity 28,000 m3/day and second phase capacity of 12,000m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh province.

Internet

A satellite switch board with 4,000 numbers, modern communication system reachs international standard and ready to meet full demands concerning on national and international communication services.

Telecommunication
LEASING PRICE
Land Leasing price 55 USD
Leasing term 2055
Other information
Payment method
Minimum plot area 10000m2
Factory Leasing price 4 USD
Leasing term 5 years
Payment method
Scale of factory 2100
Deposit 6 months
Factory for sale 0 USD
Other information
Management fee Management fee 0.5 USD
Payment method
Electricity Price Peak time 2556 VND
Normal hour 1405 VND
Off peak time 983 VND
Other information
Payment method
Water Price Price of industrial water supply (m3) 9000 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 6500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.