Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer Công ty Liên doanh TNHH Phát triển Đình Vũ
Location Phường Đông Hải II, Quận Hải An, TP. Hải Phòng
Area Total area 1463 ha
First stage 164 ha
Second stage 345 ha
Industrial Land 945 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:

Deep C/DVIZ is located at the centre of Haiphong’s infrastructure development projects, including the new International Cat Bi Airport, Lach Huyen Deep Sea Port and Hanoi – Haiphong New Expressway. Hence, our tenants can benefit from a unique location with intermodal connectivity which equals to significant savings on transportation costs.

home1fffff

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others Cat Bi Airport 10 km
Other Transportation System
INFRASTRUCTURE
Geology Condition
Roads Main road system
Internal road system
Power Supply The national grid

 

  • Source: the national (220kV) and regional (110kV) grids;

  • Capacity: 626MVA: 2x250MVA/2x63MVA;

  • Equipment: sourced from reputable manufacturers: LS cable (subsidiary of LG), ABB switchgear;

  • Distribution: Uninterrupted and highly reliable underground system;

  • Connection points: indoor, fully insulated locked cabinets;

  • Quality control: 24/7 monitoring with quality management software and onsite operation team; clients are separated into zones to avoid cross-impacts.

Standby power plant
Water Supply

 

  • Treated water capacity: 20,000 m3/day

  • Raw water capacity: 25,000 m3/day


Sewage Treatment Plant
  • Waste water treatment capacity: 6,500 m3/day

  • Only Industrial Zone in Northern Vietnam having a Waste water treatment plant with ISO 9001 and 14001 certifications.

Internet
Telecommunication
LEASING PRICE
Land Leasing price 88 USD
Leasing term 2047
Other information
Payment method
Minimum plot area
Factory Leasing price 4.5 USD
Leasing term
Payment method
Scale of factory
Deposit
Factory for sale 0 USD
Other information
Management fee Management fee 0.5 USD
Payment method
Electricity Price Peak time 2550 VND
Normal hour 1450 VND
Off peak time 903 VND
Other information
Payment method
Water Price Price of industrial water supply (m3) 10100 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 7500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.