OVERVIEW
Developer Công ty CP Công nghiệp Tàu thủy Shinec
Location KCN Nam Cầu Kiền, Thủy Nguyên, Hải Phòng
Area Total area 263.32 ha
First stage 103 ha
Second stage 160 ha
Industrial Land 166.86 ha
Factory Land 0 ha
Vacant Land 58 ha
Time Of Operation 5/2008
Total Current Investors
ISO Application ISO
LOCATION & DISTANCE
Strategic Location:
Nam Cau Kien IP has a strategic location:
Beside National Highway 10
Away from Lach Huyen Deep Waterport: 35 km
Away from Cat Bi International Airport: 20 km
Away from Van Don International Airport: 105 km
Away from Hai Phong Port: 17 km
Away from Hai Phong City Centre: 10 km
Away from Noi Bai International Airport: 125 km
Away from Hai Phong - Ha Noi National Highway: 10 km

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others Cat Bi Airport 20 km
Other Transportation System  + Hai Phong Port: 17 km
INFRASTRUCTURE
Geology Condition

 

 
Roads Main road system

 

Internal road system

 

 

 
Power Supply The national grid

 

 
Standby power plant

 

 

 
Water Supply

Sewage Treatment Plant

 

 
Internet

 
Telecommunication

 

 

LEASING PRICE
Land Leasing price 0 USD
Leasing term 5/2058
Other information
Payment method "Signing Contract in principle - deposit 40%
Signing of land sublease contract - payment of 50%
Procedures for issuing a certificate of land use rights, ownership of houses and other assets attached to land - payment of 10%"
Minimum plot area 10,000 sqm
Factory Leasing price 0 USD
Leasing term
Payment method
Scale of factory
Deposit
Factory for sale 0 USD
Other information
Management fee Management fee 0.04 USD
Payment method Infrastructure rental Negotiation depending on the location and area of the leased land (Excluding the annual land rental payable to the Government)
Services fee 15,000 VND/m2/year
Clean water connection fee 80,000,000 VND/Connection point
Wastewater connection fee 80,000,000 VND/Connection point
Surface water connection fee 80,000,000 VND/Connection point
Electrical connection fee ≤ 560 kVA: ~ 3,150 USD/ Connection point;
> 560kVA to ≤ 5MVA: ~ 6.3 USD/kVA
>5 MVA: negotiate

Besides the services of wastewater treatment plant, security, electricity, water, bumper ports, fire protection, waste treatment. The industrial park has established a service foundation through signing contracts with prestigious units/organizations such as: Banking services, medical examination and treatment services (Vinmec Hai Phong Hospital), hotels (Vinpearl, Sea Star Hotel) , ...), restaurants (Gia Vien, Hai Dang, ...), insurance (Bao Viet Insurance, ...), logistics, .... to have special preferential policies for not only investment enterprises in Nam Cau Kien but also the community of workers in the industrial park.
Electricity Price Peak time 2817 VND
Normal hour 1526 VND
Off peak time 989 VND
Other information Charge for using electricity Normal hours: 1,526 VND /kWh (From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h/ Sunday: 4-22h) Off-peak hour: 989 VND/kWh (All days from22h-4h) Peak hours: 2,817 VND/kWh (From Monday to Saturday: 9h30’ - 11h30’, 17h - 20h)
Payment method
Water Price Price of industrial water supply (m3) 19000 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 17500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee Waste treatment fee According to the quotation prescribed for each type of waste of service providers in the industrial park
Wastewater collection and treatment fee Fixed wastewater treatment fee (if the wastewater quality meets the standards of the IP): 17,500 VND/ m3 (investors pay according to the volume which is determined equal to 80% of the input water volume).
In case the wastewater quality does not meet the input standards of the IP, the Investor must pay the following costs::
_Fee for wastewater treatment exceeding threshold: 7,000 VND/m3
_ Incident compensation fee: 5,000,000 VND (the level is from 1.5 to 3 times over the standard of the Industrial Park); 10,000,000 VND (the level over 3 times the permissible standard of the IP).
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.