Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer Cty Cổ phần Khu công nghiệp Thành Thành Công
Location
Area Total area 1020 ha
First stage 360 ha
Second stage 0 ha
Industrial Land 760 ha
Factory Land 10 ha
Vacant Land 735 ha
Time Of Operation 26/12/2008
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:

Located in Anhoa commune, Trang Bang district, Tay Ninh province;

connected to HCMC via No.22 highway or Trans-Asia highway.

The location is convenient for transportation and communication as following:
- 54km to center of HCM City (through No.22 highway)
- 45km to Binh Duong province (through No.2 provincial road)
- 18km to Long An province (through 787 provincial road)
- 19km to Moc Bai border gate to Cambodia
- 60km to Cat Lai Container port
- 109km to SPCT international container port

Road To Ho Chi Minh City km km km
To township km km km
Others Trang Bang town 5 km
Railway To nearest railway station From Railway of Tay Ninh Province 7 km
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others Airport Tansonnhat 50 km
Other Transportation System  + Catlai port: 60 km
INFRASTRUCTURE
Geology Condition

"Topographic and geological characteristic: Land is flat and even; leveling altitude +1.9m compared to the Hondau national benchmark; land bearing capacity 600kg/sqm; coefficent of compressibility k>=0.85"

Roads Main road system

Internal asphalt-concrete road system is designed and built in

compliance with standards of H30 loading capacity.
Main roads: from 30m to 40m wide; from 2 lanes to 6 lanes

Internal road system
 from 20m to 27m wide; from 2 lanes to 4 lanes
Power Supply The national grid

First stage: supplied by the government power system through

Trang Bang power station (110kV/22kV)
Second stage: and internal power station with productivity of 200 MW will be developed

as a national project.
 Unit price: according to standard taiff of EVN 

Standby power plant

N/A

Water Supply
Total designed productivity: 37.000 m3/day&night
First stage: 3000 m
3/day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Sewage Treatment Plant
Total designed productivity: 30.000 m3/day&night
First stage: 3000 m
3 /day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Internet
Telecommunication
Standard system developed by VNPT or FPT
LEASING PRICE
Land Leasing price 37 USD
Leasing term 25/12/2058
Other information A
Payment method Flexible payment period: 1 year; 3 years; 5 years
Minimum plot area 5000m2
Factory Leasing price 2.6 USD
Leasing term 3 years
Payment method Quarterly
Scale of factory Standard size: 24mx48m or 1152sqm (plus 16mx16m office area)
Deposit 3 months
Factory for sale 0 USD
Other information 1152sqm
Management fee Management fee 0.0333333 USD
Payment method
Electricity Price Peak time 0.086 USD
Normal hour 0.042 USD
Off peak time 0.023 USD
Other information
Payment method
Water Price Price of industrial water supply (m3) 0.24 USD
Other information 4,500 VND/m3 (0.24 USD)
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 0.24 USD
Method of counting the volume (calculation is based on 80% of input clean water)
Payment method
Standard of input treatment B
Standard of output treatment A
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.