Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer HOANG QUAN CONSULTANT - TRADE - SERVICE - REAL ESTATE CORP
Location Ham Thuan Nam District, Binh Thuan province
Area Total area 146.02 ha
First stage 0 ha
Second stage 0 ha
Industrial Land 103 ha
Factory Land 0 ha
Vacant Land 80 ha
Time Of Operation
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location: Ham Kiem I industrial park is bordered by:
- South side is 0.65 km away from national road 1A.
- East side is 1.3 km away from DT 707 street from Muong Man station.
- West side is contiguous to Ham Kiem II industrial park.
- North side is 2 km away from North-South railway.

Next to the center:
- 9 km away from Phan Thiet Industrial park.
- 190 km away from Ho Chi Minh city.
- 150 km away from Da Lat – Lam Dong.
Road To Ho Chi Minh City 190 km km km
To township km km km
Others Phan Thiet City 9 km
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport 100 km km km
Others
Other Transportation System
INFRASTRUCTURE
Geology Condition
Roads Main road system

- The internal roads are asphalted with bitumen and designed in compliance with the Vietnam standard H18-H30 - Main roads D1: 45 meter wide roadway, other internal roads D2, D3, D4, N1, N2, N3, and N4 are from 24 – 35 meter.

Internal road system

Road (32 m) connected 1A National Road with Ham Kiem IP

Power Supply The national grid

Current power 110/22KV. Capacity 2*65 MA

Standby power plant

Capacity 2*65 MA

Water Supply

- Capacity of 6.000m3/day, First phase: capacity of 2.000m3/day (Standard TCVN 5945:2005) before it is discharged into the public system. - To Enterprise: wastewater treatment to the column C – standard TCVN 5495 – 2005. - To Industrial Park: wastewater treatment to the column A – standard TCVN 5495 – 2005.

Sewage Treatment Plant

- Capacity  of    6.000m3/day,  First  phase:  capacity  of 2.000m3/day (Standard  TCVN 5945:2005) before it is discharged into the public system.

- To Enterprise: wastewater treatment to the column C - standard TCVN 5495 - 2005.

- To Industrial Park: wastewater treatment to the column A - standard TCVN 5495 - 2005.

Internet

ADSL

Telecommunication

- Telephone: 5,000 line. - ADSL, Internet… connected with Binh Thuan’ telecommunications

LEASING PRICE
Land Leasing price 28 USD
Leasing term
Other information The Column A
Payment method
Minimum plot area 0.5ha
Factory Leasing price 0 USD
Leasing term 15 - 20 years
Payment method
Scale of factory
Deposit
Factory for sale 0 USD
Other information
Management fee Management fee 0.2 USD
Payment method
Electricity Price Peak time 1937 VND
Normal hour 1068 VND
Off peak time 670 VND
Other information Charged by Gov. suppliers
Payment method
Water Price Price of industrial water supply (m3) 8500 VND
Other information Charged by Gov. suppliers
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 0.3 USD
Method of counting the volume
Payment method
Standard of input treatment The column C
Standard of output treatment The Column A
Other Fee 0.3 usd/m3
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.