Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer HUD4
Location Km 289 National Highway 1A, Bim Son town, Thanh Hoa Province, Vietnam
Area Total area 222 ha
First stage 120 ha
Second stage 102 ha
Industrial Land 0 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation 2009
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:

Located along National Highway 1A, the territory bordering the provinces of Thanh Hoa and Ninh Binh province. 110 km South of Hanoi, 40 Km North of Thanh Hoa.

Railway: Industrial service station is located inside.

100 Km To Hai Phong Port.

90 Km To Nghi Son Port about.

130 km To Noi Bai International Airport.

 

70 km To Tho Xuan Airport.

 

Road To Ho Chi Minh City km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport km km km
To Long Thanh international airport km km km
Others
Other Transportation System
INFRASTRUCTURE
Geology Condition

Providing investors with clean plan which was leveled in sync with the system infrastructure to facilitate investors to invest and build factories.

Roads Main road system

Continuity and stability Power is taken from the 110 KV high voltage line passing through the fence BimSonIndustrial Park.
- Medium voltage network is modern  and synchronization investment, running along the roads, providing electricity to the fences of the enterprises. Enterprises Self-invest and build low-voltage stations, depending on power consumption.

Internal road system

 - The system of internal roads are designed to synchronize and modernize that make transportation to each plot of Industrial Park easier and more convenient.

- The wide of main road system is 32,5 m; the wide of loop is 26,5 m,

- Lighting System is installed along routes

Power Supply The national grid
Standby power plant
Water Supply

- Stable supply from Bim Son Water Supply Plant with a capacity of 7000 m3/day.

- Water supply system is connected to the wall fences of each enterprises.

Rainwater drainage system and waste water (sewage and industrial wastewater) are built separately. Rainwater is collected through the drain system, sewer and drainage into the outlet in the region. Waste water is collected on Plant for treating waste water of Industrial Park.

Sewage Treatment Plant

The entire industrial wastewater and domestic wastewater is treated to meet the standards before being discharged into sewage system of industrial general. After that, the Industrial Park’s Plant for treating waste water will continue processing standards prescribed by the Government of Vietnam.

Solid waste from the factory in the Industrial Park will be sorted, collected and transported to centralized processing sites of Bim Son town.

Internet

 Optical submarine cable system is connected directly to the wall fence each enterprise.

Telecommunication
LEASING PRICE
Land Leasing price 22 USD
Leasing term 2059
Other information
Payment method
Minimum plot area
Factory Leasing price 0 USD
Leasing term
Payment method
Scale of factory
Deposit
Factory for sale 0 USD
Other information
Management fee Management fee 0.22 USD
Payment method
Electricity Price Peak time 2550 VND
Normal hour 1450 VND
Off peak time 903 VND
Other information
Payment method
Water Price Price of industrial water supply (m3) 10000 VND
Other information
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 7500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other Fee
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.