Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer DUC HOA III – RESCO INDUSTRIAL & TOWN PARK JOINT STOCK COMPANY
Location My Hanh Bac Commune, Duc Hoa Dist, Long An Province, Vietnam
Area Total area 362.66 ha
First stage 0 ha
Second stage 0 ha
Industrial Land 295.66 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation 01/01/2008
Total Current Investors
ISO Application N/A
LOCATION & DISTANCE
Strategic Location:
Road To Ho Chi Minh City 40 km km km
To township 40 km km km
Others
Railway To nearest railway station From Sai Gon Railway Station of Ho Chi Minh City 40 km
Others Binh Duong Railway Station 55 km
Airway To Son Nhat International airport 35 km km km
To Long Thanh international airport 80 km km km
Others
Other Transportation System  + Sai Gon Port: 40 km
 + Hiep Phuoc Port: 70 km
 + Thi Vai - Cai Mep Port: 125 km
 + Binh Duong Port: 60 km
 + New Port: 45 km
INFRASTRUCTURE
Geology Condition

The land will be provided at altitude of 1.85m and the designed altitude for construction is 2.2m.The flooding altitude in Long An is 1.45m with probability ratio of 1%. So, the land is currently 0.45m above the 100 year flooding level after filling-up the land.
Soil Bearing Pressure: <0,7 kg/cm2

Roads Main road system

- Inter-road network including 2 main roads:

   + Road N4: 36 m (alongside South border of Industrial Park)

   + Road D1: 32m (alongside the West border of Industrial Park)

   + Road-lane: 4

- Xuyen A Road (Highway 22)

– North of Industrial Park.

- Border road 4 (DT823 – 824 – 825) towards to Tan An City and Ben Luc District.

- Border road 3- East of Industrial Park.

- Sea way located at Industrial Park: Thay Cai channel of 40m width capable of transporting small boats

Internal road system

- Internal roads

  + Width: 18-42 m

  + Road-lane: 2- 4

Power Supply The national grid

Electricity Company and currently promoting 110Kv power line for DUC HOA III - RESCO IP.
▪ 1 current local grid of 22 kV, capacity 40+63MVA, by Long An Electricity Company (EVN’s affiliate)
▪ 1 national grid of 110 kV, by Trang Bang – Duc Hoa power line which will be operated end of 2012. In 2013, DARESCO is going to build a transformer 110/22kV, capacity 1x25+1x40MVA

Standby power plant

+ Note:

The 3 peak months in 2011 were May, June and July due to the drought which caused lack of electricity for the whole country. In these 3 months, there were 3 scheduled shut down days but for maintaining the power supply system only.
The electricity is supplied with priority for DUC HOA III - RESCO IP. Most of the time the electricity were shut down in schedule, only with the unexpected problem, the electricity was shut down without notification. In the peak 3 months in 2012, there were no black out day.

Water Supply

o From Phu My Vinh Long An Water Supply JSC, capacity 15.000m3/day & night

o From Kenh Dong Long An Water Treatment Plant, capacity of first period is 40.000m3/day & night.
The sustainable pressure for water is 2.5 – 3kg/cm2.
Restriction on water consumption: The water can be consumed in the whole year. There is no restriction on water consumption

Sewage Treatment Plant

Design capacity: 10.000 m3/day
The requirement to have a waste water treatment on site is depended on the quality of wastewater. The customer’s discharged waste water is required to meet level B of Vietnam waste water treatment standards and then level B waste water will be discharged to DUC HOA III - RESCO IP waste water treatment plant to treat to level A waste water before discharging to the environment.
▪ If, the customer’s discharged waste water already meets level B of Vietnam waste water treatment standards; so, there is not required to have a waste water treatment plant on site.
▪ If, the customer’s discharged waste water dose not meet level B of Vietnam waste water treatment standards; so, there is required to have a waste water treatment plant on site.

Internet

ADSL

Telecommunication

• Communication system in Duc Hoa III – RESCO Industrial Park is allowed to connect to Long An Telecommunication network.
• Its local system will be a telephone cable network with estimated subscription of 2,223, meeting sufficient requirements on telecommunication service in the industrial park.

LEASING PRICE
Land Leasing price 55 USD
Leasing term 31/12/2058
Other information Level A
Payment method Making payments in 1 year
- 10% when signing land deposit agreement
- 10% when receiving the investment certificate
- 20% when singing the agreement for land sublease
- 20% 3 months after signing the land sublease agreement
- 20% 6 months after signing the land sublease agreement
- 20% 12 months after signing the land sublease agreement
Making delayed payments in 3 years
- 10% when signing land deposit agreement
- 10% when receiving the investment certificate
- 20% when singing the agreement for land sublease
- 10% 3 months after signing the land sublease agreement
- 10% 6 months after signing the land sublease agreement
- 10% 12 months after signing the land sublease agreement
- 15% 2 years after signing the land sublease agreement *
- 15% 3 years after signing the land sublease agreement*

(*) Interest for delayed payment of 8%/year (in USD) under amortization method
Besides that, DARESCO also gives annual payment which is flexible and suitable with requirements of employers (all information, do not hesitate to contact to Marketing Division ) (all above prices are excluded from VAT).
Minimum plot area + N/A
Factory Leasing price 0 USD
Leasing term
Payment method
Scale of factory
Deposit
Factory for sale 0 USD
Other information + N/A
Management fee Management fee 0 USD
Payment method + Periodly
Electricity Price Peak time 0 USD
Normal hour 0 USD
Off peak time 0 USD
Other information Under the regulation of EVN
Payment method
Water Price Price of industrial water supply (m3) 0 USD
Other information Under the regulation of Long An Province
Payment method
Sewage Treatment Fee Fee of sewage treatment (m3) 0.25 USD
Method of counting the volume + Equal to 80% supplied water
Payment method + Monthly
Standard of input treatment Level B
Standard of output treatment Level A
Other Fee + N/A
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.