Developer Vinh loc - Ben Luc IZ Construction and Investment J.S Company
Location Long Hiep Commune, Ben Luc District, Long An Province
Area Total area 561 ha
First stage 256 ha
Second stage 302 ha
Industrial Land 256 ha
Factory Land 10 ha
Vacant Land 80 ha
Time Of Operation
Total Current Investors
ISO Application N/A
LOCATION & DISTANCE
Strategic Location:
Road To Ho Chi Minh City 25 km km km
To township 16 km km km
Others Tan An Township 16 km
Railway To nearest railway station From Sai Gon Railway Station of Ho Chi Minh City 32 km
Others
Airway To Son Nhat International airport 28 km km km
To Long Thanh international airport 75 km km km
Others
Other Transportation System  + Sai Gon Port: 26 km
 + Bourbon Port: 4 km
INFRASTRUCTURE
Geology Condition

+ N/A

Roads Main road system

+ Width: 38m

+ Lane Amount: 4 lines

Internal road system

+ Width: 22m

+ Lane Amount: 2 lines

Power Supply The national grid

+ Electric lines supply: 22kv

-         Line 1 : Taking electricity through the high voltage line 100KV from BenLuc 110KV station to 110/22KV station of Industrial Zone.

-         After ekictrical station of Go Den Commune is established, electric sources are taken from this station.

Standby power plant

+ N/A

Water Supply

+ Maximum Capacity: 15.000 m3/day

The Industrial Zone used its separate water supplying systems, to assure sufficient supplies to demands by the businesses, by construction of drilled water wells with piping to two treatment stations of water from the wells, to treat into the standard to supply for living and manufacture, assuring quality in compliance with TCVN, before supplying for businesses in the Industrial Zone.

Sewage Treatment Plant

Capacity: 9000 m3/day

Partially to each factory, it should be treated for removing the organic, chemical, solid matters, oil, grease Then, to be connected in a collecting pipe of Industrial Zone and to be lead to the waste water treatment plant. Affter it  s treated appropriately with environmental standards (TCVN 5945-1995), it shall be drained to the channel at the North-Western direction of the Industrial Zone.

Internet

+ ADSL

Telecommunication

+ Advantage

LEASING PRICE
Land Leasing price 85 USD
Leasing term
Other information + Level A
Payment method + Once time, Yearly
Minimum plot area + N/A
Factory Leasing price 4 USD
Leasing term + N/A
Payment method + Periodly
Scale of factory + N/A
Deposit + N/A
Factory for sale 0 USD
Other information + N/A
Management fee Management fee 0.4 USD
Payment method + Periodly
Electricity Price Peak time 2500 VND
Normal hour 1350 VND
Off peak time 980 VND
Other information + Above prices not included VAT
Payment method + Monthly
Water Price Price of industrial water supply (m3) 8800 VND
Other information + Above prices not included VAT
Payment method + Monthly
Sewage Treatment Fee Fee of sewage treatment (m3) 0.4 USD
Method of counting the volume Equal to 80% supplied water
Payment method + Monthly
Standard of input treatment + Level C
Standard of output treatment + Level A
Other Fee + N/A
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.