OVERVIEW
Developer The Joint - Venture Corporation for Construction and Business of Tan Thuan EPZ (TTC)
Location Tan Thuan Dong Ward, Dist. 7, HCMC
Area Total area 300 ha
First stage 0 ha
Second stage 0 ha
Industrial Land 195 ha
Factory Land 0 ha
Vacant Land 19 ha
Time Of Operation
Total Current Investors
ISO Application
LOCATION & DISTANCE
Strategic Location:

 TTZ is located in District 7, the southeast corner of Ho Chi Minh City’s current city center. It is on a penisular surrounded by the Saigon River, with a total  area of 300 hectares.

Road To Ho Chi Minh City 4 km km km
To township km km km
Others
Railway To nearest railway station
Others
Airway To Son Nhat International airport 13 km km km
To Long Thanh international airport 55 km km km
Others
Other Transportation System  + Sai Gon Port: 5 km
INFRASTRUCTURE
Geology Condition

+ Hard soil

Roads Main road system

+ Width: 30m

+ Number of lanes : 6 lanes

Internal road system

+ Width: 12m, 20m

 + Number of lanes : 4 lanes

Power Supply The national grid

+ 22KV medium voltage lines

Standby power plant

+ reserve water purification plant inside the zone

Water Supply

+ Capacity: 35.000m3/day

Sewage Treatment Plant

+ Capacity: 10.000m3/day

+ Waste water from factories within the zone, after treated by each company, is collected into the waste water treatment palnt through public pipelines for treatment before being discharged into the river.

Internet

+ ADSL high speed line

Telecommunication

+ Installed in accordance with the Leasee’s requirement

LEASING PRICE
Land Leasing price 108 USD
Leasing term 2041
Other information + Level A
Payment method +wire-transfer via Vietcombank
Minimum plot area + N/A
Factory Leasing price 6 USD
Leasing term + at least 2 years
Payment method + all payment by wire-transfer via Vietcombank
Scale of factory 500m2, 1000m2,…
Deposit +Deposit 2 months of rental fee for leasing office premises.
Factory for sale 0 USD
Other information 6 USD/m2/month In effort of meeting the demand for available factory, TTC is executing the construction of a 6-fllor standard factory at the road No.14. The factory includes 12 units, 2 units a floor with 1,000 m2 per each in total 12,000 m2. The lift system is equipped and professional management system is employed for the whole building.
Management fee Management fee 0 USD
Payment method + Monthly
Electricity Price Peak time 0.1 USD
Normal hour 0.075 USD
Off peak time 0.03 USD
Other information + Charged by EVN + reserve water purification plant inside the zone
Payment method + Monthly
Water Price Price of industrial water supply (m3) 0.24 USD
Other information + Charged by Gov. suppliers + 35.000 m3 per day
Payment method + Monthly
+ Free for office leasing
Sewage Treatment Fee Fee of sewage treatment (m3) 0 USD
Method of counting the volume + Equal to 80 percent quanlity of clean water
Payment method + N/A
Standard of input treatment + Level B
Standard of output treatment + Level A
Other Fee + N/A
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.