Set as Homepage    Add Favorites
Please select City/Province
Please Select Industrial Park
Glanced Image
OVERVIEW
Developer Linh Trung Sepzone Company
Location Trang Bang District, Tay Ninh Province
Area Total area 202.67 ha
First stage 0 ha
Second stage 0 ha
Industrial Land 0 ha
Factory Land 0 ha
Vacant Land 0 ha
Time Of Operation
Total Current Investors 52 companys, required:VietNam (8) , Japan (3) , Thailand (2) , Singapore (3) , Hong Kong (2) , China (15) , South Korea (8) , Taiwan (2) , Malaysia (2) , Australia (2) , Canada (1) , Indonesia (1) , New Zealand (2) ,
ISO Application N/A
LOCATION & DISTANCE
Strategic Location:

Linh Trung EPZ-IP III is in the South of Vietnam, where has monsoon tropical climate with two seasons: the rainy (from May to October) and the dry (from November to April), with temperature at 27oC, humidity at 78% and annual rainfall at 2083mm averagely.

Road To Ho Chi Minh City 43.5 km km km
To township 23 km km km
Others
Railway To nearest railway station From Sai Gon Railway Station of Ho Chi Minh City 46 km
Others
Airway To Son Nhat International airport 37 km km km
To Long Thanh international airport km km km
Others
Other Transportation System  + Sai Gon Port: 45 km
INFRASTRUCTURE
Geology Condition

Flat and even terrain. the slope of the land is approximately 0.2% and the altitude of 5.5 m to 7. 5 m. The land of the zone has quite good bearing capacity, averagely from 1 kg/cm2 to 1.5 kg/cm2. The soil composition is mainly sandy clay

Roads Main road system

+ Width: 36m

+ Lane Amount: 6 lines

Internal road system

+ Width: 15m, 22m

+ Lane Amount: 4 lines

Power Supply The national grid

+ N/A

Standby power plant

+ as to the standards of TCVN1985-1994

Water Supply

+ Capacity of 15,000 m3/day

Sewage Treatment Plant

+ Capacity of 10,000 m3/day

Internet

+ ADSL

Telecommunication

+ 1,500  lines

LEASING PRICE
Land Leasing price 28 USD
Leasing term
Other information + Level A
Payment method + Installment possible
Minimum plot area + N/A
Factory Leasing price 0 USD
Leasing term + N/A
Payment method + Installment possible
Scale of factory + N/A
Deposit + N/A
Factory for sale 0 USD
Other information + N/A
Management fee Management fee 0.3 USD
Payment method + Installment possible
Electricity Price Peak time 1.48 VND
Normal hour 895 VND
Off peak time 505 VND
Other information + Charged by EVN
Payment method + Monthly
Water Price Price of industrial water supply (m3) 0 USD
Other information + Charged by Gov. suppliers
Payment method + Monthly
Sewage Treatment Fee Fee of sewage treatment (m3) 0 USD
Method of counting the volume + Equal to 80 percent quanlity of clean water
Payment method + Monthly
Standard of input treatment + Level B
Standard of output treatment + Level A
Other Fee + N/A
Homepage | News | Search | Comparison| Terms Of Use | Contact | User

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
HO Add: 62L/36 Nguyên Hồng, Ward 11, Bình Thạnh District, HCMC - Vietnam
Biz Office Add: #48 Road No 11, Quarter 6, Hiệp Binh Chánh Ward, Thủ Đức, HCMC - Vietnam
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.
Publication permit No: 60/GP-TTĐT , April 05, 2010.