Set as Homepage    Add Favorites
Hai Yen Industrial Park
Menu
Infrastructure
Geology condition
Roads
Main road system

– The width of the center road is 43.5 m. The width of main roads with 2 lanes is 33 m and the belt roads is 21,25 m
– The Industrial Park is connected with the National Road No. 18 (new) and the old national road by 02 interchanges.

Internal road system

Width: 20m - 27m

Number of lanes: 2 lanes

Power supply
The National grid

 

Power is supplied from national grid through 110/22KV transformer station with capacity of 32 MVA.

Standby power plant

N/A

Water supply

Water supply
Water treatment station with capacity of 6,500 m3/day.(The diameter of water supply pipe is D100mm – D400mm). The water is collected from Trang Vinh lake 6km far from Hai Yen IP.

Drainage system
Rain-water drainage system and waste-water drainage system is constructed separately.
– The diameter of rain-water drainage pipe is D800 mm – D1250mm with the principle of automatic drainage.

Sewage treatment plant

 

– Waste-water treament station with capacity of 4,000m3/day. Capacity increases depending on the demand.
– Industrial waste-water is by 80% water supply.
– The diameter of waste-water drainage pipe is D300mm – D600mm.
– Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Mong Cai City.

Internet

– Modern communication system reachs international standard
– People are living in the economic ring area can together use Viet Nam and China telecomunication network.

Telecommunication

Modern, Perfect

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.