Dong Mai Industrial Park
Menu
Infrastructure
Geology condition
Roads
Main road system

– The width of main roads with 2 lanes is 43 m and the branch road is 27 m and 15 m.
– The road of Industrial Park is designed to connect to Highway 18, which is convenient for transportation.

Width: 43m

Number of lanes: 4 lanes

Internal road system

Width: 21m, 27m

Number of lanes: 2 lanes

Power supply
The National grid

Power is supplied from the national grid through 110/22KV, transformer station with capacity of 1 x 25 MVA and 1 x 16 MVA.

110/22 Kv

Capacity: 25 MVA, 16 MVA

Standby power plant

N/A

Water supply

 

Water supply
– The Water supply Station has capacity of 6,500 m3/day/night.
– The diameter of water supply pipe is D100 mm to  D500mm.

Drainage system
Rain water drainage system is constructed separately with waste water drainage system in the IP. The diameter of underground rain-water drainage pipes D600 mm – D1000mm with the principle of automatic drainage.

Sewage treatment plant

– Waste water treatment Station with capacity is 4,800 m3/day.(Industrial waste water is by 80% the quantity of water supply).
– The diameter of waste water drainage pipe is D300mm – D500mm
– Solid Waste from factories in the IP shall be categorized immediately in every factory and be collected to the centered treatment area of Quang Ninh Province.

Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.

Telecommunication

Perfect, meet International Standard

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.