– Internal traffic system covers 15% total IP area, including main road with 2 lines of 37m wide and 28m wide lanes.
– Tien Son Industrial Park is linked tonational road No. 1B by 4 geometry across points and 2 fly-over bridges.
– Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.

Internal road system
Power supply
The National grid

Power is supplied from national grid through 110/22KV (35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.

Standby power plant
Water supply

Water supply
Water treatment station with first phase capacity of 7,000m3/day. (The diameter of water supply pipe is D100 mm – D300mm)

Drainage system
Rain water drainage system separate to waste water drainage system. The drainage pipe diameter is D1,000 mm – D1,250 mm with the principle of automatic drainage.

Sewage treatment plant

– Waste water treatment station with the first phase capacity is 4,000 m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh Province.

Internet

– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.

Telecommunication
Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.