Set as Homepage    Add Favorites
Yen Phong I Industrial Park
Menu
Infrastructure
Geology condition
Roads
Main road system

– Yen Phong Industrial Park is connected to national road No. 18 by a intersection traffic point and a flyover bridge. Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.
– Main roads have two 80m lanes. Branch roads are 40m and 22m.

Internal road system
Power supply
The National grid

Power is supplied by national power network via 110/22kV (35KV) transformer station with current capacity of 7 x 63 MVA.

Standby power plant
Water supply

Water supply
– Water supply station of the first phase has capacity of 36,000m3/day and the second phase has capacity of 22,000m3/day. (The diameter of water supply pipe is D150 mm – D400 mm)
– Water supply system is connected directly to the fence of enterprises.

Drainage system
– Rain water drainage system separate from waste water drainage system.
– The drainage pipe diameter is D800 mm – D1250 mm with the principle of automatic drainage.

Sewage treatment plant

– Waste water treatment station runs  with the 1st phase capacity 28,000 m3/day and second phase capacity of 12,000m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh province.

Internet

A satellite switch board with 4,000 numbers, modern communication system reachs international standard and ready to meet full demands concerning on national and international communication services.

Telecommunication
Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.