Water supply
– Water supply station of the first phase has capacity of 36,000m3/day and the second phase has capacity of 22,000m3/day. (The diameter of water supply pipe is D150 mm – D400 mm)
– Water supply system is connected directly to the fence of enterprises.
Drainage system
– Rain water drainage system separate from waste water drainage system.
– The drainage pipe diameter is D800 mm – D1250 mm with the principle of automatic drainage.