Set as Homepage    Add Favorites
Thanh Thanh Cong Industrial Zone Industrial Park
Menu
Infrastructure
Geology condition

"Topographic and geological characteristic: Land is flat and even; leveling altitude +1.9m compared to the Hondau national benchmark; land bearing capacity 600kg/sqm; coefficent of compressibility k>=0.85"

Roads
Main road system

Internal asphalt-concrete road system is designed and built in

compliance with standards of H30 loading capacity.
Main roads: from 30m to 40m wide; from 2 lanes to 6 lanes

Internal road system
 from 20m to 27m wide; from 2 lanes to 4 lanes
Power supply
The National grid

First stage: supplied by the government power system through

Trang Bang power station (110kV/22kV)
Second stage: and internal power station with productivity of 200 MW will be developed

as a national project.
 Unit price: according to standard taiff of EVN 

Standby power plant

N/A

Water supply
Total designed productivity: 37.000 m3/day&night
First stage: 3000 m
3/day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Sewage treatment plant
Total designed productivity: 30.000 m3/day&night
First stage: 3000 m
3 /day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Internet
Telecommunication
Standard system developed by VNPT or FPT
Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.