"Topographic and geological characteristic: Land is flat and even; leveling altitude +1.9m compared to the Hondau national benchmark; land bearing capacity 600kg/sqm; coefficent of compressibility k>=0.85"
Internal asphalt-concrete road system is designed and built in compliance with standards of H30 loading capacity. |
from 20m to 27m wide; from 2 lanes to 4 lanes |
First stage: supplied by the government power system through Trang Bang power station (110kV/22kV) as a national project. |
N/A
Total designed productivity: 37.000 m3/day&night First stage: 3000 m3/day&night (completed on October 2010) Unit price: 4.500 VND/m3 |
Total designed productivity: 30.000 m3/day&night First stage: 3000 m3 /day&night (completed on October 2010) Unit price: 4.500 VND/m3 |
Standard system developed by VNPT or FPT |