Infrastructure
Geology condition
Rather soft soil, it should be pilled when constructing
Roads
Main road system
+ Width: 60m
+ Number of lanes: 6 lanes
Internal road system
+ Width: 35m, 28m
+ Number of lanes : 4 lanes
Power supply
The National grid
+ 22KV medium voltage lines
+ Capacity: 675MW
+Provided by EVN
Standby power plant
Hiep Phuoc Power Plant with cap. Up 675 MVA
Water supply
Potential capacity up to 45,000 cubic meter/day
Sewage treatment plant
+ The central waste water treatment Plant with the treated capacity up to 6,000 m3/day and the solid waster ground up to 2 ha
Internet
VNPTs Perfect Services
Telecommunication
+ Installed in accordance with the Lessee’s requirement