The front of national road 1A,15km to Tra Noc Airport,
Can Tho seaport 3,000-5,000 DWT
Main road’s width is 40m, internal road 24 - 40m connect with the Can Tho Bridge.
Seaport, Airport, Traffic
Power station 110/158/22KV Capacity at 20.000KW, 25MVA
Water-supply system: the main pipe of ф300, ф200 along to the main route of IP .Water supply plant has the capacity at 7,000m3/day.There are two plants: Vinh Long plant and IP plant.
Rain-water sewerage system is constructed completely new by concrete ditches ф 800 to ф 2000, taken centre pivot to be watershed for whole area. - East-north building 4 main pipes on 2 stretch lines from IP flowing through residential area and discharged to Dong Thanh river.
Connecting to Vinh Long Post Office Telecommunication by cable of capacity of 1000x2.
Connecting to Vinh Long Post Office Telecommunication by cable of capacity of 1000x2.