Set as Homepage    Add Favorites
Binh Minh Industrial Park
Menu
Infrastructure
Geology condition
Roads
Main road system

The front of national road 1A,15km to Tra Noc Airport,

Can Tho seaport 3,000-5,000 DWT

Main road’s width is 40m, internal road 24 - 40m connect with the Can Tho Bridge.

Internal road system

Seaport, Airport, Traffic

Power supply
The National grid

Power station 110/158/22KV Capacity at 20.000KW, 25MVA

Standby power plant
Water supply

 

Water-supply system: the main pipe of ф300, ф200 along to the main  route  of  IP .Water supply plant  has  the  capacity  at 7,000m3/day.There are two plants: Vinh Long plant and IP plant.

 

Sewage treatment plant

Rain-water sewerage system is constructed completely new by concrete ditches ф 800 to ф 2000, taken centre pivot to be watershed for whole area. - East-north building 4 main pipes on 2 stretch lines from IP flowing through residential area and discharged to Dong Thanh river.

Internet

Connecting to Vinh Long Post Office Telecommunication by cable of capacity of 1000x2.

Telecommunication


Connecting to Vinh Long Post Office Telecommunication by cable of capacity of 1000x2.

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.