Đồng Văn II Industrial Park
Menu
Infrastructure
Geology condition

Solid and ready filled up

K=0.9

Roads
Main road system

+ Main road: 36m in width.

- Lighting system is equipped alongside all the roads.

Over 11% of the total IZ will be reserved for green area. System of green trees will be created alongside of the road to harmonize ecological environment.

Internal road system

+ Branch road: 23.5 m/ 18.5m in width. - Lighting system is equipped alongside all the roads.

Power supply
The National grid

High-voltage: 35KV

Standby power plant

Two Sub-stations of 110/22kV – 104 MVA

Water supply

16,000 m3/day; Water system will be installed to the fence of every factory.

Sewage treatment plant

Rain drainage water and wastewater are installed separately. Rainwater will be collected into the sewage system and discharged directly into the Canal Y-48.

Waste water of all tenants must be processed internally at the factories to meet B standard (QCVN-24/2009) before being discharged into the common waste water pipe of the Industrial Zone, the Lessor is responsible to take further treatment in order to meet the required standard of governmental regulations.

Solid waste from premises will be classified, collected and transported to the central dumping of Ha Nam Province.  

Internet
Telecommunication

Dong Van II IZ is equipped with modern telecommunication system, meeting the communication demand of multi-services such as Internet, ADSL, Video Conference, VOIP, Fax, etc. An optical fiber system is installed underground to every factory. Ensure high-speed date communication without interruption.

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.