Solid and ready filled up
K=0.9
+ Main road: 36m in width.
- Lighting system is equipped alongside all the roads.
Over 11% of the total IZ will be reserved for green area. System of green trees will be created alongside of the road to harmonize ecological environment.
+ Branch road: 23.5 m/ 18.5m in width. - Lighting system is equipped alongside all the roads.
High-voltage: 35KV
Two Sub-stations of 110/22kV – 104 MVA
16,000 m3/day; Water system will be installed to the fence of every factory.
Rain drainage water and wastewater are installed separately. Rainwater will be collected into the sewage system and discharged directly into the Canal Y-48.
Waste water of all tenants must be processed internally at the factories to meet B standard (QCVN-24/2009) before being discharged into the common waste water pipe of the Industrial Zone, the Lessor is responsible to take further treatment in order to meet the required standard of governmental regulations.
Solid waste from premises will be classified, collected and transported to the central dumping of Ha Nam Province.
Dong Van II IZ is equipped with modern telecommunication system, meeting the communication demand of multi-services such as Internet, ADSL, Video Conference, VOIP, Fax, etc. An optical fiber system is installed underground to every factory. Ensure high-speed date communication without interruption.