Lê Minh Xuân 2 Industrial Park
Menu
Infrastructure
Geology condition
Roads
Main road system

 Tran Dai Nghia street (scheduled road about 40m width)
 Provincial Route 10 (scheduled road about 40m width)
 Highway No.3 (scheduled road about 74m width)
 National Highway No. 1A

Road system :
Internal transport systems in the industrial zone is planned :
- Main Road :  30m .
- Internal Road  :  16 - 18m .

Internal road system

Main road : 30 m width
Internal road: 16 - 18 m width

Power supply
The National grid

Electricity supply system:
The power will be supplied from the substation 110/15 (22) kV LMX and 110kV high-voltage lines Woody - Duc Hoa should be very favorable for the power supply.

Standby power plant
Water supply

Water supply system:
Le Minh Xuan 2 IP will use fresh water from 02 sources :
- Clean Water Plant of Industrial Park with the capacity 11.500m3 per day.
- Thu Duc Water Plant and Water Station, Binh Tri Dong with his implicit interest 12.000m3 per day.

Sewage treatment plant

Waste and waste water treatment system:
IPs planned wastewater treatment plants have concentrated waste water treatment tasks were preliminary cleaning from businesses operating in Le Minh Xuan Industrial Zone 2 input standard QCVN 40 : 2011 - Column B and ensure output of wastewater treatment standards under QCVN column A 40 : 2011 . Total capacity of the waste water treatment plant is 9,000 m3 per day.

Column C according to the National Technical Regulation on industrial wastewater QCVN 40 : 2011

Internet
Telecommunication
Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.