Tran Dai Nghia street (scheduled road about 40m width)
Provincial Route 10 (scheduled road about 40m width)
Highway No.3 (scheduled road about 74m width)
National Highway No. 1A
Road system :
Internal transport systems in the industrial zone is planned :
- Main Road : 30m .
- Internal Road : 16 - 18m .
Main road : 30 m width
Internal road: 16 - 18 m width
Electricity supply system:
The power will be supplied from the substation 110/15 (22) kV LMX and 110kV high-voltage lines Woody - Duc Hoa should be very favorable for the power supply.
Water supply system:
Le Minh Xuan 2 IP will use fresh water from 02 sources :
- Clean Water Plant of Industrial Park with the capacity 11.500m3 per day.
- Thu Duc Water Plant and Water Station, Binh Tri Dong with his implicit interest 12.000m3 per day.
Waste and waste water treatment system:
IPs planned wastewater treatment plants have concentrated waste water treatment tasks were preliminary cleaning from businesses operating in Le Minh Xuan Industrial Zone 2 input standard QCVN 40 : 2011 - Column B and ensure output of wastewater treatment standards under QCVN column A 40 : 2011 . Total capacity of the waste water treatment plant is 9,000 m3 per day.
Column C according to the National Technical Regulation on industrial wastewater QCVN 40 : 2011