Infrastructure
Geology condition
Land is filled up and compacted to meet K = 0.9
Roads
Main road system
Tam Thang 2 IP is designed and constructed with standard road system, ensuring convenient transportation of means. Main road is 30m; Access road is 22m.
Internal road system
Power supply
The National grid
22 kV
Standby power plant
Water supply
25.000m3/day
Sewage treatment plant
Collecting and treatment system of wastewater to meet A level. Capacity of 2.000m3/day and it is increasable according to the actual requirement.
B/ QCVN 40-2011
Internet
ADSL, Fiber
Telecommunication
Available