Infrastructure
Geology condition
Flat and even terrain.
Good bearing capacity, averagely from 1 kg/cm2 to 1.5 kg/cm2.
The soil composition is mainly sandy clay
Roads
Main road system
+ Width: 36m
+ Lane Amount: 6 lines
Internal road system
+ N/A
Power supply
The National grid
110 Kv Power Station with capacity of 40 MVA for exclusive utility of the IP; Electricity price is as per Regulations of the Prime Minister
Standby power plant
+ N/A
Water supply
+ Water supply system attained standards 1329/BYT of Health Ministry
Sewage treatment plant
* System of waste water discharge and rain water discharge separately.
* Being carry out legal procedures to construct the wastewater treatment plant (to set up
investment project, design and put it out to tender).
Internet
+ ADSL
Telecommunication
+IDD