Set as Homepage    Add Favorites
Det may Pho Noi B Industrial Park
Menu
Infrastructure
Geology condition

E = 120-125 kG/cm2 Ro = 1.3-1.4 kG/ cm2

Roads
Main road system

The main road is the two-way street, 7.5mx2 in width. Tree range: 8m in width The separating strip is 2m, the pavements along the road is 8m-9m

Internal road system

The side road is 11.25m, the pavements along the road is 6m

Power supply
The National grid

The electric power of 20.000 kVA, 50HZ for the IP within mall oscilatio supplied by Hung Yen Power company.This electricity is reserved of industrial production.

Standby power plant

N/A

Water supply

 Water supply station with capacity of 17,000 m3/day.

Water supply system is connected directly to the fence of enterprise

Sewage treatment plant

Wastewater treatment station with capacity of 10,000 m3/day and can be enhanced to 12,000 m3/day.Provided by the Netherlands and installed in accordance with European standards II

Internet

ADSL,Telephone network system and Asymmetric Didital Subscriber Line.

Telecommunication

Modern communication system reaching international standard and ready to meet full demands concerning on national and international communication services

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.