-
Source: the national (220kV) and regional (110kV) grids;
-
Capacity: 626MVA: 2x250MVA/2x63MVA;
-
Equipment: sourced from reputable manufacturers: LS cable (subsidiary of LG), ABB switchgear;
-
Distribution: Uninterrupted and highly reliable underground system;
-
Connection points: indoor, fully insulated locked cabinets;
-
Quality control: 24/7 monitoring with quality management software and onsite operation team; clients are separated into zones to avoid cross-impacts.
-
Treated water capacity: 20,000 m3/day
-
Raw water capacity: 25,000 m3/day
-
Waste water treatment capacity: 6,500 m3/day
-
Only Industrial Zone in Northern Vietnam having a Waste water treatment plant with ISO 9001 and 14001 certifications.