Investment Procedure
Land
Leasing Price
0 VND, approximately: 0 USD/ m2/ 50 years
Leasing term
5/2058
Payment method
"Signing Contract in principle - deposit 40%
Signing of land sublease contract - payment of 50%
Procedures for issuing a certificate of land use rights, ownership of houses and other assets attached to land - payment of 10%"
Signing of land sublease contract - payment of 50%
Procedures for issuing a certificate of land use rights, ownership of houses and other assets attached to land - payment of 10%"
Minimum plot area
10,000 sqm
Factory
Leasing Price
0 USD/ m2/ month
Leasing term
Payment method
Scale of Factory
Deposit
Factory for sale
0 USD
Others
Management fee
Fee
0.04 USD/ m2/ month
Payment method
Infrastructure rental Negotiation depending on the location and area of the leased land (Excluding the annual land rental payable to the Government)
Services fee 15,000 VND/m2/year
Clean water connection fee 80,000,000 VND/Connection point
Wastewater connection fee 80,000,000 VND/Connection point
Surface water connection fee 80,000,000 VND/Connection point
Electrical connection fee ≤ 560 kVA: ~ 3,150 USD/ Connection point;
> 560kVA to ≤ 5MVA: ~ 6.3 USD/kVA
>5 MVA: negotiate
Besides the services of wastewater treatment plant, security, electricity, water, bumper ports, fire protection, waste treatment. The industrial park has established a service foundation through signing contracts with prestigious units/organizations such as: Banking services, medical examination and treatment services (Vinmec Hai Phong Hospital), hotels (Vinpearl, Sea Star Hotel) , ...), restaurants (Gia Vien, Hai Dang, ...), insurance (Bao Viet Insurance, ...), logistics, .... to have special preferential policies for not only investment enterprises in Nam Cau Kien but also the community of workers in the industrial park.
Services fee 15,000 VND/m2/year
Clean water connection fee 80,000,000 VND/Connection point
Wastewater connection fee 80,000,000 VND/Connection point
Surface water connection fee 80,000,000 VND/Connection point
Electrical connection fee ≤ 560 kVA: ~ 3,150 USD/ Connection point;
> 560kVA to ≤ 5MVA: ~ 6.3 USD/kVA
>5 MVA: negotiate
Besides the services of wastewater treatment plant, security, electricity, water, bumper ports, fire protection, waste treatment. The industrial park has established a service foundation through signing contracts with prestigious units/organizations such as: Banking services, medical examination and treatment services (Vinmec Hai Phong Hospital), hotels (Vinpearl, Sea Star Hotel) , ...), restaurants (Gia Vien, Hai Dang, ...), insurance (Bao Viet Insurance, ...), logistics, .... to have special preferential policies for not only investment enterprises in Nam Cau Kien but also the community of workers in the industrial park.
Electricity Price
Peak time
2817 VND/ KWH
Normal hour
1526 VND/ KWH
Off peak time
989 VND/ KWH
Other information
Charge for using electricity Normal hours: 1,526 VND /kWh (From Monday to Saturday: 4h - 9h30, 11h30 - 17h and 20h - 22h/ Sunday: 4-22h)
Off-peak hour: 989 VND/kWh (All days from22h-4h)
Peak hours: 2,817 VND/kWh (From Monday to Saturday: 9h30 - 11h30, 17h - 20h)/ KWH
Payment method
Price of Water Supply
Price of Industrial water supply (m3)
19000 VND
Other information
Payment method
Sewage Fee
Sewage Fee (m3)
17500 VND
Method of counting the volume
Payment method
Standard of input treatment
Standard of output treatment
Other fee
Waste treatment fee According to the quotation prescribed for each type of waste of service providers in the industrial park
Wastewater collection and treatment fee Fixed wastewater treatment fee (if the wastewater quality meets the standards of the IP): 17,500 VND/ m3 (investors pay according to the volume which is determined equal to 80% of the input water volume).
In case the wastewater quality does not meet the input standards of the IP, the Investor must pay the following costs::
_Fee for wastewater treatment exceeding threshold: 7,000 VND/m3
_ Incident compensation fee: 5,000,000 VND (the level is from 1.5 to 3 times over the standard of the Industrial Park); 10,000,000 VND (the level over 3 times the permissible standard of the IP).