Phuc Long Industrial Park
Menu
Infrastructure
Geology condition


Phuc Long Industrial Park on high ground. Low-cost infrastructure for Geological drilling results: 10m to hard soil.

Roads
Main road system

1 main street

Internal road system

6 crossing streets

Power supply
The National grid

Power is connected from existing 22KV conductor line, along National road 1A.

Standby power plant
Water supply

Go Den water supply phant of 7.200 m3/day capacity.

Water supply standard: 40 m3/ha.

Total water use need: 3.160 m3/day.

Sewage treatment plant

2600m3/day

Internet

VNPT

Telecommunication