Infrastructure
Geology condition
Phuc Long Industrial Park on high ground. Low-cost infrastructure for Geological drilling results: 10m to hard soil.
Roads
Main road system
1 main street
Internal road system
6 crossing streets
Power supply
The National grid
Power is connected from existing 22KV conductor line, along National road 1A.
Standby power plant
Water supply
Go Den water supply phant of 7.200 m3/day capacity.
Water supply standard: 40 m3/ha.
Total water use need: 3.160 m3/day.
Sewage treatment plant
2600m3/day
Internet
VNPT
Telecommunication