- The main traffic in the East - West including 4 lanes, 18m wide.
- The main traffic in the North - South including 4 lanes, 18m wide.
- The system of internal roads from 2-4 lanes, wide from 10-16m.
- Power supply for the industrial zone is 22kv medium voltage from grid station 110/22kv (has been connected to industrial park).
- Power 2000m3/ day in the process of building.
- Power 2000m3/ day , Pressure Class A standards with Vietnam standards TCVN 5945:2005.
- Modern and spacious system of collection solid waste.