Infrastructure
Geology condition
+ Hard soil, (1,5-2,5kg/cm2)
Roads
Main road system
+ Width: 22 m, 35m
+ Number of lane: 2 lanes, 4 lanes
Internal road system
+ Width: 15m, 22m
+ Number of lane: 4 lanes
Power supply
The National grid
+ Power line: 110/22KV
+ Capacity:103MVA
Standby power plant
+ N/A
Water supply
+ Capacity: 4.500 m3/day
+ Max Capacity: 15.000m3/day
Sewage treatment plant
+ 2.000m3/day
Internet
+ ADSL
Telecommunication
+ Installed in accordance with the Lessee’s requirement