Asphalt road
Main road: standard H30
Internal road: 16-30m
- Ben Luc substation: 110/22KV, capital 40 + 63 MVA.
- Rach Chanh - Can Duoc substation: 40MVA.
- Industrial Park substation: 110/22KV, 65MVA
In addition to the industrial park water supply 3.600 m3/day, the more power from two plants: Water Plant Go Den 7.200 m2/day and Hoang Long water plant 10.000m3/day
Land area 7.000m2.
Capacity of phase 1: 6.000 m3/day.
Capacity of phase 2: 6.000m3/day.
Wastewater standard of Enterprises: standard B – QCVN 40:2011/BTNMT.
Industrial park wastewater treatment standards A - QCVN 40:2011/BTNMT.
ADSL
Ensure the provision of telephone, fax, internet ... for investors