Average humidity :82%
Topography: the average height +1.2 ÷ +1.5 m
Geology condition: The land will be graded with sand/soil up to the elevation of +1.4 m equal to National elevation. (all costs will be born by Thai Hoa IP)
- Factory for rent:
+ Bearing capacity: 3-5 tons/m2
+ Wall Height: 2,2 m
+ Road 36m : width 36m , length 11km
+Road Thay Cai: width 20m, length 11km
Consists of four main roads (A, B, C, D) long 2,000 m,
Road B-C : width 44m
+ The power source of Thai Hoa IP is incessantly stable and supplied from the three following sources:
· Duc Hue 220/110 kV transformer station with capacity 63 MVA
( 20 km from the IP)
· Duc Lap 100 kV transformer station with capacity 63x2 MVA
( 2 km away from the IP)
· Duc Hoa II 220/110 kV transformer station with its capacity 63 MVA. It will be installed in nearly future.
(7 km away from the IP)
+ N/A
+ Clean water supply system provided by Phu My Vinh Company.
+ Capacity: 15.000 m3 per day.
+ Waste water from factories is collected through the underground piping network and treated in the Sewage Treatment Plant with capacity 2.000 m3 per night and day in according to The Vietnam Environmental Standard (TCVN 5945:1995 - C colum) before its falling into Thay Cai River
+ Stormwater pumping stations are required for pumping of stormwater runoff. Its capacity is 20.000 m3/hour/machine
+ VNPT, FPT, Viettel
+ 1000 lines
+ high-speed fiber optic bandwidth capacity up to 100Mbqs
+ the fee under the state regulations