Infrastructure
Geology condition
+ Hard soil
Roads
Main road system
+ Width: 30m
+ Number of lanes : 6 lanes
Internal road system
+ Width: 12m, 20m
+ Number of lanes : 4 lanes
Power supply
The National grid
+ 22KV medium voltage lines
Standby power plant
+ reserve water purification plant inside the zone
Water supply
+ Capacity: 35.000m3/day
Sewage treatment plant
+ Capacity: 10.000m3/day
+ Waste water from factories within the zone, after treated by each company, is collected into the waste water treatment palnt through public pipelines for treatment before being discharged into the river.
Internet
+ ADSL high speed line
Telecommunication
+ Installed in accordance with the Leasee’s requirement