AMATA Industrial Park
Menu
Infrastructure
Geology condition

+ Hard soil

Roads
Main road system

+ Width: 52m

+ No. of lane: 4 lanes

Internal road system

+ Width: 24m

+ No. of lane: 2 lanes

Power supply
The National grid

+ Power lines transmission 22 kv

+ Private power plant: current net capacity is 13MW

+ Power substation from national grid (EVN): 80MVA (64MW)

Standby power plant

+ N/A

Water supply

 + Maximum Capacity:  30.000m3/day

Sewage treatment plant

 + Maximum Capacity:  5000m3/day

Internet

+ ADSL

Telecommunication

+ Installed in accordance with the Lessee’s requirement