Set as Homepage    Add Favorites
Long Hau Industrial Park
Menu
Infrastructure
Geology condition

- Topography: alluvial delta, lower from West to East.
- Land high standard: 2.5 m
- Soil bearing capacity: Rtc= 55.1 kPa
- Underground water level: 200m from ground.
- Surface rupture stability: stable.

Roads
Main road system

Main road: 40 m
INFRASTRUCTURE: 100% completed.
- Road system:
Connecting with Ho Chi Minh city via Nguyen Huu Tho alignment road (North - South) with capacity of 10 lane lines.
The traffic network is designed to connect with other neighborcities and provinces:
+ National highway 1A to Mekong delta provinces – Ho Chi Minh – Trung Luong.
+ Long Hau – Tan Tap – National Highway to Mekong delta provinces.
+ Phu Mybridge to Eastern provinces.
+ Ho Chi Minh city belt road system No. 4 - Southern inter-regional highway system.
- Waterway traffic system:
+ Connecting to deep water ports of Ho Chi Minh city including Sai Gon Premier Container Terminal (SPCT) which can receive vessels from 4,000 - 5,000 TEU.
+ Sai Gon Hiep Phuoc portcan receive vessels 50,000 tons.
+ Tan Cang Hiep Phuoc port can receive vessels 40,000 tons.
+ Kinh River port inside Long Hau Industrial Parkcan receive vessel 1,000 tons and barge 2,000 tons, meeting the demand of manufacturers in Long Hau Industrial Park for water transport at low cost. With the average width of 130m and transport depth from 6.8 - 10.3m, Kinh river connects to the most important waterway transportation of Ho Chi Minh city: Sai Gon - Nha Be - Mekong delta provinces, Eastern provinces and the East Sea.

Internal road system

Secondary road: 35m & 24 m

+ Width: 22 m

+ Number of lanes: 2 lanes

Power supply
The National grid

+ Power line: 15 Kv

Step-down station EVN 110/22KV - 37 MWA (inside Long Hau Industrial Park).

Power source: 22 KV - Frequency: 50 Hz

Standby power plant

+ N/A

Water supply

10,000 – 12,000 m3/day Clean water
• QCVN 09:2008 (Groundwater Quality of National Standard)
• QCVN 01:2009 (Potable water Quality of National Standard)

Sewage treatment plant

+ Capacity: 5000 m3/day

The central sewage treatment plant with 10,000m2 is in charge of treating pre-treated sewage from factories in Long Hau industrial park. Total treatment capacityis 5,000m3/day.

Internet

+ ADSL

Telecommunication

While Long Hau IP is in Long An, the tenants can use Ho Chi Minh city’s phone number and the most advanced telecommunication technologies including cable internet, leased line… to make sure telecommunication always works properly, saving costs of calling to Ho Chi Minh numbers.

Phone: Use HCM area code (08)

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.