Thang Long 2 Industrial Park
Menu
Infrastructure
Geology condition

Hard land

Roads
Main road system

Width: 22m

Number of lanes: 2 lanes

Internal road system

With: 15m

Number of lanes: 2 lanes

Power supply
The National grid

110kV/22kV Sub-Station



Standby power plant

• Have own Sub-Station 110kV/22kV connected directly to the National High Voltage Grid

1st upgraded capacity: 176 MVA  (completed on Dec.’2012)

• Underground 22kV Distribution Cable System with connection points available to each land plot is in place to reduce the risk of power stoppage.

Water supply

Designed capacity:       22,500 m3/day&night
1st upgraded capacity:  13,500 m3/day&night

Sewage treatment plant

Designed capacity:     15,000 m3/day&night
Initital capacity:             3,000 m3/day&night

Internet

ADSL

Telecommunication

DID, FAX

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.