+ N/A
+ Width: 38m
+ Lane Amount: 4 lines
+ Width: 22m
+ Lane Amount: 2 lines
+ Electric lines supply: 22kv
- Line 1 : Taking electricity through the high voltage line 100KV from BenLuc 110KV station to 110/22KV station of Industrial Zone.
- After ekictrical station of Go Den Commune is established, electric sources are taken from this station.
+ N/A
+ Maximum Capacity: 15.000 m3/day
The Industrial Zone used its separate water supplying systems, to assure sufficient supplies to demands by the businesses, by construction of drilled water wells with piping to two treatment stations of water from the wells, to treat into the standard to supply for living and manufacture, assuring quality in compliance with TCVN, before supplying for businesses in the Industrial Zone.
Capacity: 9000 m
3/dayPartially to each factory, it should be treated for removing the organic, chemical, solid matters, oil, grease Then, to be connected in a collecting pipe of Industrial Zone and to be lead to the waste water treatment plant. Affter it s treated appropriately with environmental standards (TCVN 5945-1995), it shall be drained to the channel at the North-Western direction of the Industrial Zone.
+ ADSL
+ Advantage