Geology condition
  • Flat and even terrain.
  • Good bearing capacity, averagely from 1 kg/cm2 to 1.7 kg/cm2.
  • The soil composition is mainly sandy clay
Roads
Main road system

+ 6 lanes with 60m in width

Internal road system

+ 2-4 lanes with 29m - 35m in width

 

Power supply
The National grid

 

  Power is supplied from two sources 110/22KV:

Outside sources:

• Thanh Duc substation         capacity of 40 MVA

• Trang Bang substation        capacity of 2 x 40 MVA

   Onsite sources: total capacity of 500 MVA

• No. 1 onsite substation       capacity of 2 x 63 MVA

• No. 2 onsite substation       capacity of 2 x 63 + 40 MVA

• No. 3 onsite substation       capacity of 2 x 63 MVA

• No. 4 onsite substation       capacity of 2 x 63 MVA

Electricity charge: price offered by Electricity Company of Vietnam

Monthly payment

 

Standby power plant

+ N/A

Water supply

            On-site water treatment plant, capacity 120,000m3/day night

            Water consumption charge $ 0.3 USD/m3

Monthly payment

 

Sewage treatment plant
  •  Capacity of 90,000m3/day night, meet QCVN 24/2009/BTNMT level A, before being discharged.
  •  Waste water treatment charge $ 0.25 USD/m3                                                                       (equal to 80% of consumed clean water)
  • Large and modern center for collection and classification of garbage

Monthly payment 

 

Internet

+ ADSL

Telecommunication

+ IDD

Homepage | News | Search | Comparison| Terms Of Use | Contact

INDOCHINA INTERNATIONAL CONSULTING CO., LTD
KK11 Ba Vi Street, Ward 15, District 10 ,Ho Chi Minh City
®Source: http://viipip.com should be clearly quoted for any use of information extracted from our website.